Showing posts with label I-275. Show all posts
Showing posts with label I-275. Show all posts
BRT Alternative for Tampa Bay
Ashon Nesbitt
So, it appears HART (Hillsborough Area Regional Transit) is moving forward with Tampa Bay's first bus rapid transit (BRT) line, which will connect north Tampa (USF, Fowler area) with Downtown Tampa called MetroRapid. It's not as exciting as light rail, but it is progress. Thinking about how residents may be reluctant to support rail, particular the extensive network I previously proposed on a previous post, I thought about an extension of MetroRapid into Westshore and across the bay into St. Petersbug. With the expansion of I-275 in west Tampa to include a large median for future transit and the rebuilding of the northbound Howard Franklin bridge to include a transit envelope, this may be a good time to move forward with such an initiative.
![]() |
| Eagan Transit Station, Eagan, MN |
This is how it would work. The new Howard Franklin northbound would include two to four additional lanes. I propose making these tolled express lanes for carpools and accessible by buses. These lanes would continue through west Tampa in the new large median of I-275, which is purposely designed for this purpose. On the Pinellas side, it would require the construction of additional lanes on I-275 from the MLK/Ulmerton interchange to downtown St. Pete. Into south St. Pete, convert one lane of I-275 into the carpool/bus lane. The combined BRT line would connect all the major employment/activity centers in the metro area.
![]() |
| Major retail redevelopment near Brooklyn Center Transit Station, Brooklyn Center, MN |
With this BRT line, new "transit centers" would be created in north Tampa, Seminole Heights area and Westshore in Tampa along with Gateway, downtown St. Pete and 22nd Avenue S/I-275 area in St. Pete. Each would be park-and-ride centers, but also destinations of their own with restaurants, retail and multifamily housing. I good example would be the various transit centers in the Minneapolis/St. Paul area.
The political appeal would be in the creation of carpool lanes. So it still supports our preferred method of transportation, the car. However, it provides capacity for buses to move more quickly and with a higher frequency, similar to rail. Economically, it would benefit all, in that our major employment and activity centers become more accessible (e.g. a south St. Pete resident might apply for a job in Westshore if there was the option to park and ride from 22nd Avenue S across the bridge rather than drive). I think this is a viable alternative to rail, and one worth exploring.
12:32 AM
BRT
,
bus rapid transit
,
downtown
,
HART
,
Hillsborough
,
I-275
,
locally preferred alternative
,
Pinellas
,
Rail
,
south St. Petersburg
,
St. Petersburg
,
transit-oriented-development
South St. Pete Redevelopment Part II: 22nd Avenue and I-275
Ashon Nesbitt
So, in South St. Pete Redevelopment Part I, we outlined a plan for the development of a major mixed-use center, primarily retail, for south St. Pete. The development of this retail center involved several key things, mainly the realignment of SPC facilities and the ability of the city and/or private developer to obtain control of several properties along the 34th Street South corridor. However, if/when all the pieces came together, a major center would be developed that would change 34th Street South and south St. Pete forever, for the better!
Now, the other major proposal for south St. Pete is the redevelopment of the 22nd Avenue S and I-275 interchange area. This proposal involves a major re-construction of the interchange to allow for major redevelopment around it. The goal is to create a walkable, mixed-use district (retail, housing and office) around a proposed transit station that spans both sides of I-275. The area currently includes a mix of strip shopping centers, and industrial center and single-family homes on dead-end streets. The redeveloped area creates greater connectivity within the area, and redevelops all properties into an urban mixed-use center.
The first step involves the reconstruction of the interchange at 22nd Avenue S and I-275. This concept involves combining the 22nd Avenue S and 26th Avenue S interchanges into one, with one-way frontage roads on each side of the interstate. The second step is building a bridge for a 24th Avenue S underpass under I-275. This creates additional connectivity, with 24th Avenue becoming the center and pain pedestrian pathway east and west.
The majority of the commercial space would be focused on 34th Street. On the east side of the street would be mixed-use buildings (dark red), 3 to 5-stories in height with retail at the base and office and/or residential on the floors above. On the west side of the street would be purely retail space (light red). All parking (light gray) would be in the rear of the buildings. The fronts would have generous sidewalks and landscaping to encourage walking.
East of I-275, the concept calls for an office-building (blue) of 5- to 7-stories. This could be used by one large company or several smaller companies, bringing much needed jobs to the area. This would be served by structured parking (dark gray) to the north, that would also be public parking for transit riders. To the south would be a mixed-income apartment building (purple) surrounding structured parking (dark gray). Further south, at 31st Street and 26th Avenue S, would be brand-name hotel (orange) to serve the area.
This mixed-use center, combined with the new major center to the south would completely transform 34th Street S and lead to further redevelopment throughout south St. Pete.
Now, the other major proposal for south St. Pete is the redevelopment of the 22nd Avenue S and I-275 interchange area. This proposal involves a major re-construction of the interchange to allow for major redevelopment around it. The goal is to create a walkable, mixed-use district (retail, housing and office) around a proposed transit station that spans both sides of I-275. The area currently includes a mix of strip shopping centers, and industrial center and single-family homes on dead-end streets. The redeveloped area creates greater connectivity within the area, and redevelops all properties into an urban mixed-use center.
The first step involves the reconstruction of the interchange at 22nd Avenue S and I-275. This concept involves combining the 22nd Avenue S and 26th Avenue S interchanges into one, with one-way frontage roads on each side of the interstate. The second step is building a bridge for a 24th Avenue S underpass under I-275. This creates additional connectivity, with 24th Avenue becoming the center and pain pedestrian pathway east and west.
The majority of the commercial space would be focused on 34th Street. On the east side of the street would be mixed-use buildings (dark red), 3 to 5-stories in height with retail at the base and office and/or residential on the floors above. On the west side of the street would be purely retail space (light red). All parking (light gray) would be in the rear of the buildings. The fronts would have generous sidewalks and landscaping to encourage walking.
East of I-275, the concept calls for an office-building (blue) of 5- to 7-stories. This could be used by one large company or several smaller companies, bringing much needed jobs to the area. This would be served by structured parking (dark gray) to the north, that would also be public parking for transit riders. To the south would be a mixed-income apartment building (purple) surrounding structured parking (dark gray). Further south, at 31st Street and 26th Avenue S, would be brand-name hotel (orange) to serve the area.
This mixed-use center, combined with the new major center to the south would completely transform 34th Street S and lead to further redevelopment throughout south St. Pete.
6:38 PM
I-275
,
mixed-use
,
redevelopment
,
south St. Petersburg
Subscribe to:
Posts
(
Atom
)


